Industrial & Wastewater
600_arizonafalls

Location: Phoenix, AZ

Scope: Installation of underwater, above ground, display and architectural landscape lighting. This project involved the resurrection/beautification of a hydroelectric plant and neighborhood gathering place built over a natural 20-foot drop in the Valley’s canal system, which is an extension to the City’s Herberger Park. To turn the project into the desired show piece, the design team included engineers, architects and artists which developed underwater and display lighting to highlight the sheer water drops, inlay rock details and other unique features. The lighting package we installed was central to creating the desired effect.